Battery Racks and Battery Charger InstallationBattery AssemblyBattery Charger InstallationInitial Charging of Battery Charger shall be unpacked and inspected for damage arger shall be mounted and located as on project drawings ternal connections shall be checked to make certain that no wires have worked loose during transit sulation resistance test shall be performed on ac input wiring and dc output power wiring. Installation manual instructions shall be followed, to prevent damage to solid state components.See more on paktechpoint huawei